Renovation in the Heart of Edgbaston

Brief Description


This project was an entire refurbishment and kitchen extension.

Every aspect of the project was sympathetically considered, to ensure all original features were brought back to life and restored to their form of glory. We formed and fully fitted three bespoke en suites with bespoke fittings and fixtures.

A stunning modern extension was added to the kitchen area to make a really practical yet beautiful family space. The entire house was plastered and decorated from top to bottom and the property is now one of the best in the area.

Project Type Full Renovation
Location Edgbaston
Completion Date September 2016
Project Time 30 Weeks