Commercial Refurbishment

Brief Description

A large commercial engineering office in central Birmingham, required refurbishment. The works consisted of splitting all the building services into two, all plumbing, heating, electrics, ventilation etc. New glazed partitioning. Replacement of old partitioning. Removing walls. Blocking and installing new door ways. Installing suspended ceilings. New LED lighting systems, projector presentation facility, internet, phone and data systems. New flooring throughout. The offices had to be fully functioning during works with minimum distribution. This was achieved by our operatives as pointed out in the managers review.

Project Type Office Refurbishment
Location Central Birmingham
Completion Date 1st May 2017
Project Time 6 Weeks

“Phoned Pro-Build 360 and had help and assistance from 1st contact.
Bahram, Max and Tehmi visited our office and listened to our requests.
They responded in a friendly and professional manner with advice and recommendations.
The work was completed in a timely manner and to a good quality.
Max was always around to answer questions and keep the project on track and on time.
I would be happy to work with Pro-build again in the future.”

 

 

*Review posted on Houzz.*